So, February. RadCon is this weekend, which I'll be missing due to logistical reasons. Next year, I hope to make a return trip and sit on some panels again. I've enjoyed the three times I've been there in the past. It's very much a fan run con and it never fails to entertain with the little eccentricities that appear. And for whatever reason, the hotels' restaurant is always understaffed and getting food there is a giant pain in the arse.
My reading list isn't overly full at the moment, but I have a couple of interesting reads in progress. First is Blacksad, a graphic novel translated and put out by Dark Horse Comics. It's best described as a Noir detective with anthropomorphic characters. The protagonist is John Blacksad, a hardboiled private investigator who spends a lot of time in trouble and getting his ass kicked by goons. The artwork is fantastic, being painted and not just inked. The writing is superb and engrosses from the get go. I had a hard time putting it down after the first story. I highly recommend people taking a look at it.
The other one is Beasts of Burden: Animal Rites by Evan Dorkin and Jill Thompson. This is also a graphic novel by Dark Horse comics. A group of dogs [and one cat] band together to prevent their town from being overrun by evil. It's bit of horror mystery mixed with adventure and humor along the way. A fair bit of attention is given to the animals to make them stand out with quirks and some of the obstacles they encounter. Not having opposable thumbs is a disadvantage when you're dealing with demonic frogs and the raising of the dead. Another recommended read for people looking for something a bit less harsh.
The plague is sweeping through the office the last few weeks and I've managed to dodge the worst of it [so far]. This week's busy with a major restock order and some changes in responsibilities. I need to come up with a way to better organize my time if only to make me feel like I have a handle on things. My buddy told me of a cheese bar in the Hipster side of Seattle, which we're going to check out in the evening.
Word count so far this month in 7,662 or 85% on my target as of yesterday. I have more than enough time to catch up.
Thursday, February 11, 2016
Thursday, February 4, 2016
STATE OF THE [VIDEO] GAME
I like games. I work at a company that sells games as a purchasing
assistant. I own more games than I’ve played and the queue just keeps getting
bigger. Right now, I’m knee-deep in multiple video games with more on the horizon
that’re going to demand my time.
My current addiction is a little 2-D, side-scrolling, rogue-like called Dark Dungeon. To be upfront, it’s not my normal fare in gaming. Death is permanent, the difficulty gives a new meaning to the word hard, and RNGesus loves to come in and kick you repeatedly. But there’s a story in the game, some excellent narration by Wayne June, and a graphic style that reminds me a lot of Hellboy. There’s a lot to love about the game. I’ve racked up triple digits in the game, since you can log in, play 30 minutes at a stretch, and then leave. It’s a nice little time killer.
My current addiction is a little 2-D, side-scrolling, rogue-like called Dark Dungeon. To be upfront, it’s not my normal fare in gaming. Death is permanent, the difficulty gives a new meaning to the word hard, and RNGesus loves to come in and kick you repeatedly. But there’s a story in the game, some excellent narration by Wayne June, and a graphic style that reminds me a lot of Hellboy. There’s a lot to love about the game. I’ve racked up triple digits in the game, since you can log in, play 30 minutes at a stretch, and then leave. It’s a nice little time killer.
The big one in my current playlist is Fallout 4. It’s a franchise that caught
my interest way back in the day when it was going to be based on GURPS. The
deal fell through because of the iconic Pip Boy artwork was deemed too silly
[or so the story goes]. I had to upgrade the video card in my machine to get it
running decently and while I’ve not huge amounts of time, I try to play a
couple times a week. Again, we get back to the story and little things that
make the series interesting. The main story isn’t the strongest and if Preston
asked me one more time to help a settlement, I’m gonna scream. There’s other
bits that make up including references to HP Lovecraft, getting the USS Constitution
up and running again, and some seriously messed up bits if you explore off the
beaten path. Not to spoil anything, but there’s a cabin in the woods near
Sanctuary Hills with a skeleton, mattress, and a diary. It was depressing to
say the least. Thank you Bethesda. You put out a buggy game and manage to make
me come back for the little things to find.
X-Com 2 drops tomorrow, another series that I’ve played since the first
installment. I didn’t get the reboot until it’d been out a year and then played
it like no one’s business. I love the new story, the single base aspect, and
listening posts aka satellites. That’s what I did in the original game and it
works well. I’m looking forward to playing it once I get done with everything
else on the list. I believe that the new DOOM is due out this year for more
first person shooting goodness.
Sitting mostly untouched in my queue is Sub-Nautica, Tales of the
Borderlands, and Shadowrun: Hong Kong. I
got those for Christmas off my Steam wish list from folks and they beckon me to
play. I’m running up against not enough time again. The solution is dedicating
a chunk of time to play them like I do with my writing. Set aside an hour to
play something and a few extra on the weekend. There’s raiders to kill and
ghouls to blast. The Commonwealth isn’t going to save itself.
Thursday, January 28, 2016
GAMES & THE RUINING OF BUDGETS
Running late this week, but here we go...
Working
at a game distributor is dangerous to my budget. I get to see ALL the games
that are available to buy. Being a big RPG fan, there’s a tidy selection of
books about 15’ away from me that I can go drool over. Then there’s the board
games which dominate the majority of the showroom floor. Our warehouse is a
gamer’s dream stop if money was no object. Not everything is worth buying, but
I could get close to picking up one of everything and never play them all. The
final bit of enticement to spend money is toys; action figures, POPs, along
with knickknacks and branded merchandise. And most of it moves quite well.
My
work desk is by no means the most cluttered one in the office in terms of
having figurines and other pop culture items. There’s a section devoted to
Fallout [all hail the post-apocalypse] and I’ve got a red dragon mini on my
computer, but there’s plenty of space to work. I do plan about 75% of my
purchases in advance. As we get 3+ months of warning and publishers love to
miss street dates, it’s easy to budget for it. There are impulse buys and those
are items which slip under the radar. A co-worker gave me a bit of advice when
I first started – Bills first, toys later. It requires discipline to work here
at times and that bleeds over into writing.
I
try to write every day if possible and set a goal of at least 1,000 words. Some
days are better than others but I keep going. Yesterday was a bad for me and I
had a lot of stress built up by the time I got home. My impulse was to make
dinner, grab a beer, watch some videos or play a game, and then bed. It
would’ve been so easy to do that. Instead, I decided to be an adult and take
the hard road. I packed my laptop and headed out the door. Being a creature of
habit, I plopped down at Starbucks, got my coffee, and began to pound out a
scene for my novel. When I was done 90 minutes later, I had ~1,600 words and
much less stress. Why? Because I’d made
progress on my novel and that made up for all the other crap that’d gone on
earlier.
Then
I went home, ate, did dishes [more adult stuff], chatted with some fellow
writers, and then relaxed to watch videos. Did not get to bed early, but I felt
a lot more accomplished when I finally did crawl between the sheets. Today’s a
new challenge and I’m sure someone’s going to get on my nerves. And just like
yesterday, I’m going to go home, get my laptop, and go write. Cause it’s what I
do. It’s who I want to be, a disciplined writer.
Foot
note – Cause my brain hates to settle on one thing, it just gave me an idea for
a short story.
Thursday, January 21, 2016
Gaming and the Story
True
confession time, I’m a gamer. Have been for close to 40 years and
it’s a hobby I still enjoy. There’s something about making a
character, writing background, and rolling dice that makes for an
enjoyable evening. In that time, I’ve played the whole gamut of
games, including a big foray into minis, collecting the Ravenloft
setting books for 2nd Edition D&D [more on this
later], and my current love of narrative RPGs [FATE and Dungeon World
as examples]. I work for a game distribution company [board games,
RPGs, that little CCG called Magic, and other stuff you might find in
a card or game store. I always thought about being in the “industry”
and my job gives me a good overview of how it functions, for better
or worse depending on the day. That’s my background and frame of
reference for the next bit.
My
approach to gaming has always been more about the story than the
min/maxing of characters. Even as a GM, I wanted to tell a story of
the characters and worked to frame that around the bigger picture of
the world. Looking back, it was an unfair thing to do to my players.
I was trying to get them to dance to my jig without giving them
enough motivation or insight on how things worked. And that’s on
top of trying to plan for what players will do. The logical and
sensible path? Hell no, we’re going to cut through the Swamp of
Sinking Death and tackle this Mire Lich Drake we keep hearing rumors
about. At 3rd level no less. I’d rather herd cats and
leads me to my current outlook on games and running them.
It's a simple rule that I work by: Let the
players choose and adapt on the fly.
Back in the day, I’d have set up a grand
scheme and a bad guy with big plans, then set the players to go fight
him/her/it. And off the rails they’d go, chasing whatever seemed to
grab their interest at the moment and ignoring the plot. Even if I
presented it with bells, whistles, gold, and magic, they were doing
their own thing. That lead to more than a bit of frustration on my
part and theirs. They had no investment in the story and I had all
the investment in the story. Most of my campaigns were short-lived as
a result and never satisfying to the extent I wanted.
A few
days ago, Wizards of the Coast announced they were releasing a new
Ravenloft module/campaign setting for 5th edition. I’ve
been watching the recent books and not bought them for variety of
reasons. This one might get me to spend a bit of cash to support my
favorite hobby. There’s something about it that makes me just want
to dive back in. Somewhere I have the original module along with the
sequel [which had nothing to do with the Strahd]. All this got me
thinking gaming and how story figures into the hobby.
Narrative-style
games aren’t new, but they’ve enjoyed a spike in popularity over
the last decade. It gives control to the players to tell their
character’s story. Dungeon World goes to the point of not having
the GM roll any dice. Sure, the GM will still need to build the world
and create interesting people to interact with, but he or she is no
longer the sole source of story. Each side collaborates in the game
and both are better off for it. Letting go is hard, but well worth it.
Thursday, January 14, 2016
The First of 2016
Ah sweet rejection, I’d forgotten how much it stings. There’s always that twinge of doubt that
makes me ponder if I should try again or just bin everything. It lasts for a
few minutes, then I go and update my spreadsheet, move files around, and poke
around to see if anything is open were it might fit. I take the time to dive into my homeless file
for a quick review. There’s potential in there and I’d hope that some editor
will look at the story and think, “That’s just what I need for my
anthology”. I can add in a list of
rewrites [2], unfinished shorts [~10], novellas [1], and novels [2] all which
beg for completion. Then there’s the paranormal mystery series rolling around
in my head that needs more face time. The bright, new, and shiny tempt me away
to dive into the project and drop the current one. I can’t do that. Then
nothing gets done, the writing languishes, and the frustration grows.
Tonight, I’ll head out to the coffee shop and write until they close.
It’s my routine on weekdays after work. I go from one job to the next, neither
of which pay all that well, but both are ones that I enjoy. Writers have an odd
life, as 75% of the ones I know do the exact same thing. We have two jobs when
really we should have just one. That’s the other source of frustration. I’m not
a Steven King or George RR Martin, but I think I’m decent enough [and some
people, not relatives, have told me I’m good] to make some living off writing. At
the moment, I’m not quitting my day job and working in the evenings to make the
other dream come true. I’ve set myself a goal to have the first draft done
before March, then work like crazy on the edits for a possible submission by June.
Six months should be enough time.
This week’s been rough in the way of losing great creative people. David
Bowie died on Sunday, Alan Rickman died today [01/14/16], and Lemmy Kilmister from
Motorhead late last month. I’m not a big metal head, but I grew up with
listening to him and Bowie in high school. Rickman was a late edition to people
I loved to watch, though my favorite role will always be in Galaxy Quest. It
spurs me on to make the most of my current situation and get those words to
paper, if just to leave a small footprint in the world that says I was here.
Let's all get out there and put our footprint on the world in whatever manner. Life's too damn short not to.
Thursday, January 7, 2016
2016 - The Year Ahead
2015 was a crap year to be honest in
terms of writing. I didn't get nearly enough done as I wanted and hit
a few major stumbles along the way. So, here we are, a week into 2016
and let's lay bare my goals. I have a novel in process, which I think
is about 60% complete after scrapping half of the first attempt. Six
of the first seven chapters are complete, as are the last four, which
leaves 5-6 in the middle to write. I'm swapping between two POV
characters every few chapters to show more of what's going on behind
the scenes. First person works for me in story telling, but doesn't
give a good view of the players and events in motion. My goal is to
have the draft done by the end of January and then start a slow
rewrite. I might miss a submission window for a particular publisher,
but that just gives me more time to revise it.
Aside from the short stories, there's
the ongoing GRONK! series of stories that need attention and my
assassin, Henri, has a few stories waiting in the wings. I have a
collection of short stories that are crying out for attention, so I
need to revisit them and see if I can find them homes individually.
Last November I attended Living Dead Con and sat in a publisher's
panel. I asked about single author collections and the universal
consensus was they sold like crap. Anthologies weren't much better,
but offered a different experience. Peddling them as a collection is
on the back burner and I've dabbled in the single story sales of
e-pub. That angle needs to be explored further. I sold my second
erotic bit of fiction and received some good feedback. There was a
rejection on a third piece and what I think to be an amusing bit of
feedback from the editor. They liked the “action” scenes, but not
the framing story, so I was doing things half right I guess.
I've got a few cons on my agenda with
an eye on those dealing with writing and other interests. One of my
friends suggested SakuraCon here in Seattle just of the experience
and I'm definitely looking at Emerald City ComicCon, plus Norwescon.
November promises BizarroCon which I had a blast at last year. Not as
a writer, as my mind isn't bent that way, but as a consumer. I don't
mean bent in a bad way, cause these authors put out some seriously
good stuff. My fiction's more strawberry and chocolate ice cream vs.
the vegan coconut milk orange toffee surprise variety.
I still have a stack of books to read,
more Fallout 4 to play, and looking forward to the next Marvel
movies. There's even a good chance I'll see some tabletop gaming this
year on a regular basis. Oh yeah, X-Com 2 is on the way, so more
alien killing goodness. There's a trip to see my dad planned for
later in the year and not because there's a BBQfest being held in
that area. Nope, not at all.
I hope that everyone has a great 2016
and let's see if I can do more than one blog post a month.
Monday, December 28, 2015
A New Year, A New Reading Challenge
Guest post by Jaylee
James
The end of the year is a great time for reflecting on what you’ve
accomplished in the past year, and where you want to go in the next – what
things you wish you had done differently. My planner has a section at the front
suggesting I make a list of what I did well in 2016 – what major things
happened over the last year – in order to celebrate. It also suggests I take
time to think about where my 2016 resolutions went off track so I can better
prepare for 2017.
But let’s talk about the most important aspect of the New Year.
It’s time to make our 2016 Reading Challenges on Goodreads.
I’m aiming for 100 books this year. Last year I aimed for 50, then later
upped it to 100 because I finished my challenge in June and that’s just no fun
at all. No. A reading challenge is no fun unless you are scrambling to finish
off your Currently Reading shelf the week after Christmas to a chorus of “Who
cares?” and “What does it matter?” and “It’s just a reading challenge,” from
your non-reading friends and family.
As I write this, I will need to read … a book every three days in order to
finish. Not bad. I’ve definitely done worse. Thank goodness for holidays off
from work so I can spend time with family read for hours on end.
Reading should be fun, and personally I think challenges make it more so.
There have been a lot of reading blog challenges floating around the
internet this month, such as only reading female authors, or reading two
diverse books for every book by a boring ol’ white dude. I saw one on twitter
the other day that suggested reading in an alphabet pattern. Your first book
begins with A, next must begin with B, etc. (My hearty well-wishes to them for
finding books beginning with Q, X, and Z.)
In 2014 I challenged myself to try out new genres, and found that I
actually adore mystery novels, and romance novels are not nearly as terrible as
I thought they were (in fact, I wound up loving romance so much that I’m now
attempting to write it!).
No matter what your reading challenge for 2016, may I suggest that you push
yourself to try something you’ve never tried before? Read a genre you’ve never
attempted, or make an effort to try out books you previously scorned because of
their hideous covers. Maybe pick up a book set in another country, or on a hard
topic you generally shy away from.
Surprise yourself next year. I think you’ll find it’s worth it.
What about you… What are your challenges for 2016? Did anything awesome
come out of your 2015 challenges?
---
Jaylee James is a writer of science fiction, fantasy,
romance, and variations thereof. She is most well known as the Senior Editor of
the LGBT lit mag Vitality Magazine. Her work has appeared in Wings of Renewal,
a solarpunk dragon anthology, and her time-travel romance short, Choosing You,
was released in November. Visit her at JayleeJames.com to learn more about her
upcoming projects.
Wings of Renewal: http://amzn.to/1IjjbOE
Choosing You: http://amzn.to/1QOVjFd
Vitality: https://readvitality.com
Subscribe to:
Posts (Atom)

